General International 50-EXBC10 Use and Care Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
10
5. Tighten the mounting bolts and secure the boom mount channel in position on the extension table. (Fig.22)
6. If you notice any sag or if the extension table is not level with the main table, adjust the height of the support
leg (Fig. 23, ) to support the added weight of the boom/hood assembly.
7. The diagonal braces can be tightened or loosened to allow the boom assembly to be levelled as needed by
adjusting the nuts on the eye bolt. (Fig. 23)
Fig. 22
Fig. 23
ADJUSTMENTS
1. The resistance or balance of the swing arm assembly can be
adjusted with the spring knob located on the rear of the swing
arm assembly. (Fig. 24)
2. The hood may be locked in any position by tightening the
hood lock handle located on the right side of the hood.
(Fig. 25)
Note: It is recommended the hood be locked in the upper posi-
tion when removing or swinging the boom and hood assembly
from the saw.
3. The length of the telescoping boom may be adjusted by loos-
ening the boom clamp knob and sliding the inner boom
in or out as required. (Fig. 26)
Note: Do not over-tighten the clamp knob. It takes little pres-
sure to clamp the boom securely.
Fig. 24
Fig. 25
Fig. 26
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments